Past Projects

Year Location Size Project Description
2016-19 Ogbele Field, Nigeria 10,000 bpd Modular Refinery Expansion Perform engineering, procurement, fabrication, construction and maintenance.
2018-19 Minnesota, USA Alcohol to Hydrocarbon Plant Perform Complete Process Design.
2018-19 Nevada, USA 5,000 bpd Renewable Diesel Facility Perform Feasibility Study.
2018-19 Utah, USA 10,000 bpd Yellow Wax Upgrading Facility Perform Feasibility Study.
2018-19 Warri, Nigeria 10,000 bpd Modular Refinery Perform Feasibility Study.
2018-19 Texas, USA 10,000 bpd Bunker Fuel Hydrotreater FEED Perform Front End Engineering Design.
2018 Ekulama Flow Station, Nigeria 90,000 bpd LACT Unit with Solar Power Design, fabricate and install Lease Automatic Custody Transfer unit.
2018 Chittagong, Bangladesh 3,600 bpd CRU Capacity Upgrade Upgrade capacity of catalytic reformer unit.
2018 Oklahoma, USA Modular Truck Load Rack and LACT unit for Condensate Design, fabricate and install Lease Automatic Custody Transfer unit.
2017 Arizona, USA 2,000 bpd Modular DHT Design, fabricate and install modular diesel hydrotreater.
2016 Texas, USA 2,000 bpd Modular DHT Design, fabricate and install modular diesel hydrotreater.
2016 Nevada, USA 2,000 bpd Modular DHT Design, fabricate and install modular diesel hydrotreater.
2016 Nigeria 10,000 bpd Modular Refinery Expansion Design, fabricate and install modular hydroskimming refinery.
2015 Nevada, USA 1,000 bpd Modular Transmix CDU Design, fabricate and install modular transmix CDU.
2015 Nevada, USA 2,000 bpd Modular DHT Design, fabricate and install modular diesel hydrotreater.
2015 Texas, USA 2,000 bpd Modular DHT Design, fabricate and install modular diesel hydrotreater.
2013 Nigeria 5,000 bpd CDU Design, fabricate & install modular CDU.
2013 California, USA 1,000 bpd Methylester Unit Design & fabricate modular biodiesel plant.
2012 Texas, USA VRU Design, fabricate, & install modular vapor recovery unit.
2012 Indonesia 12,000 bpd CDU; 5,500 bpd VDU Design, fabricate, & install modular CDU / VDU.
2011 Bangladesh 3,000 bpd NHT; 2,500 bpd CRU Design & refurbish CRU / NHT.
2010 Nigeria 1,000 bpd CDU Design, fabricate, & install modular CDU.
2009 Nigeria 21,000 bpd Design, fabricate, & install modular crude oil flow station.
2009 Indonesia 6,000 bpd CDU; 3,000 bpd VDU Design, fabricate, & install modular CDU / VDU.
2008 Iraq 5,000 bpd Design, fabricate, & install 20.0 mmbtu/h modular process heater fuel system.
2006 Nevada, USA 1,000 bpd Splitter Design, fabricate, & install modular transmix splitter.
2006 Nigeria 5,000 bpd Design, fabricate, & install modular five- well manifold extension for an existing crude oil flow station.
2005 Utah, USA 250 bpd Design, fabricate & install modular equipment for processing shale oil.
2005 Nigeria 10,000 bpd Design and fabricate modular crude oil flow station.
2004 California, USA 6,000 bpd CRU Design for conventional construction.
2003 Santa Cruz, Bolivia 1,000 bpd Design, fabricate, & install modular CRU / Splitter / NHT.
2003 Texas, USA 5,000 bpd Design, fabricate, & install gas liquids terminal and modular stabilizer.
2003 Buenos Aires, Argentina 6,500 bpd NHT/CRU Design, fabricate, & install modular CRU / NHT / Splitter/ Isom.
2002 Bulgaria 6,000 bpd CDU; 2,000 bpd VDU Design, fabricate, & install modular CDU / VDU.
2001 Thailand 20,000 bpd CDU Refurbishment of new surplus modular unit.
2000 Nigeria 10,000 bpd Design, fabricate, & install modular crude oil flow station.
1999 Republic of Georgia 1,000 bpd CRU Design, fabricate, & install modular CRU.
1999 Tula, Russia 2,000 bpd CDU Refurbish & install modular CDU.
1999 Republic of Georgia 2,000 bpd CDU Design, fabricate, & install second modular CDU.
1998 Reupublic of Georgia 2,000 bpd CDU Refurbish & install modular CDU.
1998 Dagestan, Russia 6,000 bpd CDU; 2,000 bpd NHT; 2,000 bpd CRU Refurbish conventional CDU / HDS / CRU.
1997 Khartoum, Sudan 1,500 bpd NHT; 1,500 bpd CRU Refurbish conventional NHT/CRU.
1997 Russia 10,000 bpd Design conventional CRU / HDS / Splitter / ISOM.
1996 Persian Gulf 50,000 bpd CDU Engineering & design CDU.
1995 Novosibirsk, Russia 1,000 bpd CRU Engineering & design conventional CRU.
1995 Indonesia 4,000 bpd Supplied a new self-contained unit that processes various refinery sludge streams and recovers hydrocarbons.
1994 Russia 3,000 bpd CDU Design, fabricate, & install modular CDU.
1994 Argentina 3,000 bpd NHT/CRU Design, fabricate, & install modular NHT/CRU.
1992 Sudan 2,000 bpd CDU Dismantled, refurbished, erected, and commissioned this unit.
1988 Texas, USA 1,500 bpd CDU Design, fabricate, & install modular CDU.
1985 Texas, USA 6,000 bpd CDU Design, fabricate, & install modular CDU.
1984 Texas, USA 1,500 bpd CDU Design, fabricate, & install modular CDU.
1981 Wyoming, USA 6,000 bpd CDU Design, fabricate, & install modular CDU. Later relocated to North Pole, Alaska.
1980 New Mexico, USA 1,500 bpd NHT/CRU Dismantle, refurbish & install conventional NHT/CRU.
1980 Alice Springs, Australia 700 bpd CDU Design, fabricate, & install modular CDU.
1979 Texas, USA 5,000 bpd CDU Design, fabricate, & install modular CDU.
1978 New Mexico, USA 1,000 bpd NHT/CRU Dismantle, refurbish & install conventional NHT/CRU.
Our Location

2722 I-45, New Waverly, TX 77358

Hours of Operation: Mon-Thu, 7:00a-5:00p